American Structural Engineering (ASE) was a SBE sub-consultant to WSP/Group 2 in 2021 and to for ATANE/Group 3 in 2021 & 2022 (Ongoing) Bridge Inspection program. ASE provided two full teams (TL and ATL) to perform the inspection of over 50 bridges on the mainline and leading ramps. ASE teams were responsible for performing inspection including all active structural and safety priorities, critical and special emphasis members, updating inventory, forms and final report preparation.
Client: NJTA
Location: New Jersey
NYS Thruway Bridges Biennial Inspection
Throgs Neck Bridge Biennial Inspection
George Washington Bridge Biennial Inspection
Region 9 Bridges Biennial Inspection
Brooklyn Bridge Biennial Inspection
Verrazano-Narrows Bridge Biennial Inspection
Queensboro Bridge Biennial Inspection
Williamsburg Bridge Biennial Inspection
Queens Midtown & HLC Tunnels Biennial Tunnel Inspection
Bronx Whitestone Bridge Biennial Inspection
Kent Avenue, Brooklyn (MPT Plans) (HWK1048-C)
R44 SIR (Staten Island Railroad) Inspection of the Car Framing
Constructibility Review for Structural Components of the Henry Hudson Bridge
Robert Moses Niagara Power Plant, Bridge Inspection Project