American Structural Engineering (ASE) was an MBE sub-consultant to Thornton & Tomasetti for 2021-2022 Biennial Inspection and Design of Throgs Neck Bridge. ASE provided one full team, (TL and ATL) to perform the inspection of this bridge. ASE team was responsible for performing inspection, forms and final report preparation, inspecting all active structural and safety flags, inspecting critical and special emphasis members and updating inventory. ASE team performed inspection work on Main Span and both Bronx and Queens approaches.
Client: TBTA
Location: New York, NY